Work Item: More Actions

Work Items Actions: Multi Start Route

OVERVIEW

Multi Start Route option allows the user to perform routing for multiple items at one time.

User needs to select Items having same status in the same project

HOW TO PERFORM MULTI START ROUTE:

  • Select the Work Items Icon from Main Menu
  • Select the Required Work Item
  • Select the Single/multiple Items by checking the Checkbox in the Work Item Grid (Items having the same status)
  • Select the Multi Start Route option from More Actions Icon
  • A dialog window appears, select Ok to start routing.
  • Start Routing Success message gets displayed

Note: User need to define E-Records Signature for the work item before routing.

Multi Start Route option is not available for Defects and DMS Items without Revision or Revision which is marked Protected

RELATED LINKS

Add Revision in DMS Items

E-Records Signature

Related Articles